HomeMy WebLinkAbout12729 UST131201 101 08-02-2021 PLAN11129 SJP UNITED FOOD AND FUEL #3 55592.13 —] SIMPLIFYING THE COMPLEX
. .
CONSULTANTS
RECEIVED
By Joe Pearson at 10:24 am,Aug 13, 2021
August 2,2021
Joe Pearson
Alabama Department of Environmental Management
UST Corrective Action Section
Groundwater Branch
1400 Coliseum Boulevard
Montgomery,Alabama 36110
RE: Workplan and Cost Proposal Number 35 for Monitoring Well Abandonment
United Food and Fuel No.3
2051 Bell Street
Montgomery,Alabama
Facility ID No. 12899-101-009493
Incident No.UST13-12-01
PPM Project No.20114602.MWA
Dew Mr. Pearson:
Per your letter dated May 28,2021,PPM Consultants,Inc.(PPM)has prepared this workplan
and associated Cost Proposal No. 35 for abandoning twenty nine 2-inch diameter Type II
monitoring wells (MW-1 through MW-29) and three 4-inch diameter Type II groundwater
recovery wells(RW-1, RW-2,and RW-3) at the above-referenced site. The locations of the
wells are shown in Figure 1, Site Map,Attachment A.
All of the wells will be abandoned in accordance with the Alabama Department of
Environmental Management (ADEM) guidelines and Administration Code R. 335-6-15-
.29(8). Abandonment activities will be performed under the supervision of a PPM geologist.
Abandonment of the monitoring wells will consist of over drilling the well casing and screen
at each location to total depth and then tremie-grouting the boring with a cement/bentonite
grout. The drill cuttings and well materials will be placed in a roll-off container and
transported to a certified landfill for proper disposal.
An estimated total of 89 feet of casing and screen of 4-inch diameter Type II recovery wells
and 880 feet of casing and screen of 2-inch Type 11 will be over drilled to total depth and
grouted.
The well covers and concrete pads of the monitoring wells will be completely removed at
each location, and the surrounding surface returned to original conditions (grass, gravel, or
concrete).
ppmco.com o 251.990.9000 0 30704 Sergeant E.I.Boots Thomas Drive,Spanish Fort,Alabama 36527
Mr.Joe Pearson
August 2,2021
Page 2
Photo documentation will be provided of the abandonment activities. Costs for the
abandonment, along with subcontractor quotes are provided in Attachment B, Cost
Proposal No.35.
If you have any questions,please contact us at(251) 266-7915.
Sincerely,
PPM Consultants, Inc.
1
Ro e . Ki ore, G.
Project
RMK:kdw
Cc: Mr. Ben McNeill
ATTACHMENTS
ATTACHMENT A - FIGURE
P WMPSIERMAXWI W]
N AIRF RCE O E&SE + fV /Goo ! / MW46
�/ w MW35
f0
G
M m +fro/ f MI
O
pSCALE
�
(.gyp➢YOSIIBOA,) f� / �' wP �0 INDEPENDENT
GLASS
G l' ,tP MW-1] COMPANY
Z
jzz
V MINI
j/ eD m 1 e ' w I
p vEL
YW.15 MIRW3 Op w +
MW15 w MW-31 METER
O MW1i
fD J /e + TRW--t/� P R w `I'
MI \� 4� GRAVEL MW-15 w
+MWd w wp. MINI w
MW-14 54
/P Ww + w MW.11
MI LEGEND:
MW 5 w w
p GRAVEL
DUMP5lER CANOPY + MONITORING WELL LOCATION
® RECOVERY WELL LOCATION
MIw MW To TELECOM
L SECURITY
—To DOD FIBER OPTICS
TREES —ro TELECOM OPTICS
MWy P ELECTRIC
OVERHEAD ELECTRIC LINE
ww WATERLINE
SERVICE ROAD g FENCE
t POWER POLE
p ^ ULTANT FIGVRE
MCNEILL FAMILY PARTNERSHIP NDMBER
DRAWNEYI'CP DRAWNaATE21 UNITED FOOD OD AND ELL EE EL NO. 3 SITE MAP
v 201 rvu 60 vHASE: MONTGOMERY,ALABAMA
201142 MWA