Loading...
HomeMy WebLinkAbout12724 009491 101 12-14-2020 ATGTEST SLA AUTOMATIC TANK GAUGE TEST 71932.28 ATGTEST ADEM ANNUAL TANK GAUGE TEST REPORT FOR YEAR Facility Name: Owner: Address: Address: City, County,Zip: City, State,Zip: Facility I.D.#: Phone#: Tester Name: Tester Phone#: Tester Company: Test Date: Instructions 1. Submit a completed copy of this form within 30 days of performing test to: Groundwater Branch,PO Box 301463,Montgomery,AL 36130-1463,or fez to: (334)270-5631,or email to: USTcompliancettDadernslabarni . 2. This form allows you to record up to 6 ADEM Unique Tank Numbers,assuming that the Facility ID Number remains the same. 3. Inspection and Testing must be performed in accordance with a nationally recognized code of practice(such as PEI RP-1200 or equivalent)or the manufacturers instructions. 4. Keep a copy of this testing for 3 years. Questions on how to complete this form should be directed to the Groundwater Branch, UST Compliance Unit at(334)270-5655. 5. If the probe is not used for leak detection but the console is(e.g.double walled tanks using interstitial monitoring),then it does not need to be tested. ADEM Unique Tank# Product Stored Automatic Tank Gauge Console Test Does console test history include test ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes alarms?(Don't forget to clear test alarms ❑ no ❑no ❑no ❑no ❑no ❑ no Does site setup agree with configuration ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes shown in console? ❑ no ❑no ❑no ❑no ❑no ❑ no Is battery backup operational? 0 yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑ no ❑no ❑no ❑no ❑no ❑ no Testing results? 13 pass 13 pass O pass 13 pass 13 pass 13 pass Must meet all applicable criteria to pass. [3 fail 0 fail 0 fail 0 fail 0 fail ❑fail Probe and Float Test Is probe free of residual buildup? 0 yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑ no ❑no ❑no ❑no ❑no ❑ no Are cables free of kinks? 0 yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑ no ❑no ❑no ❑no ❑no ❑ no Was shaft inspected and free of damage? 0 yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑ no ❑no ❑no ❑no ❑no ❑ no Do ficats move freely? 0 yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑ no ❑no ❑no ❑no ❑no ❑ no Does measured product and water levels in ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes tank agree with console levels? ❑ no ❑no ❑no ❑no ❑no ❑ no Does actual product float level agree with ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes console product float level? ❑ no ❑no ❑no ❑no ❑no ❑ no Does Overfill alarm activation level agree ❑yes 0 We ❑yes 0 n/a ❑yes 0 n/a ❑yes 0 n/a ❑yes 0 We ❑yes 0 n/a with console? ❑ no ❑no ❑no ❑no ❑no ❑ no Does actual water float level agree with ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes console water float level? ❑ no ❑no ❑no ❑no ❑no ❑ no Does water alarm activation level agree with ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes console? ❑ no ❑no ❑no ❑no ❑no ❑ no Testing results? 13 pass ❑pass O pass 13 pass 13 pass ❑pass (Must meet all applicable criteria to pass.) 0 fall 0 fail 0 fall 0 fall 0 fall L ❑fail Repairs Needed Date of Description of any Repairs Repair Tester's Signature: ADEM Form 565