HomeMy WebLinkAbout18370 000062 101 11-26-2019 SPILLT QMV SPILL BASIN TEST RESULT 70842.51 0 w V PILLT
ADEM
SPILL CATCHMENT BASIN/SPILL BUCKET
3 YEAR TEST LOG
Submit a copy of this tone to:Groundwater Branch,PO Box 301463 Montgomerv.AL 36130-1463,or fax to 334 270-5631
Facility Name: pe y owner.S& Eagles, C
Address: 117$We5 t By Address:P.o Box 792
CHI xMontaomeM AL361U5 I Cily, State,Zip: Millbrook,AL 36054
Facility I.D.M22 2-101-000062 I Phone#:
Tester Name: auj Qfiayea I Tester Com an : PP.I japlinaj I C I Tester Phone#:205-3934517
AD61i Split Catchment BasinfSpill Bucket Test Procedure
Clean the spill catchment basin/spill bucket and add enough water to completely fill the basin. Measure the water level(the
measuring stick must be placed in the same location at the beginning and and of the test period to ensure accurate water level
readings). If the water level drops by 1/8th inch or more after at least one hour,the spill catchment basinispill bucket fails the
test. If the test fails,proceed as follows: - -
1. Do not fill the tank until after the spill catchment basin1spill bucket is repaired or replaced.
.2. Repair or replace the spill catchment basintsplll bucket.
3. If there is evidence,or you suspect that product was released from the spill catchment basin/spill bucket,contact the
ADEM Corrective Action Section at 334/270-5655 to report a suspected or confirmed release as soon as possible
(within 24 hours).
-An optional vacuum test method is described in the Petroleum Equipment Institute(PEI)Recommended Practice
1200.
ADEM Unique Tank#
Product Stored Regular Regular2 Premium2
Lid in good condition and u'yes Wyes N(yes ❑yes ❑yes ❑yes
seals ro ed ❑no ❑no ❑no ❑no ❑no ❑no
Water, Fuel,Trash 8 Debde yes yes yes ❑yes ❑yes ❑yes
removed from basin? ❑no ❑no ❑no ❑no ❑no ❑no
If es,dispose of properly) ❑n/a ❑n/a ❑n1a ❑n/a ❑n/a ❑n/a
❑yes ❑yes ❑yes ❑yes ❑yes ❑yes
Drain valve operational? ❑ o ❑//110 ❑nno ❑no ❑no ❑no
yes aryes yes ❑yes ❑yes ❑yes
Fill pipe cap seals propedy9 ❑no ❑no ❑no ❑no ❑fro - ❑no
❑n/a ❑n/a ❑n/a ❑n/a ❑Iva ❑We
Basin free of cracks ar holes9 ❑ s 11 Ayes ❑yes ❑yes ❑yes
if no,it fails without lesfin no M o tl no ❑no ❑no ❑no
Was enough water added to yes gas yes Dyes ❑yes ❑yes
completely fill the basin ❑no ❑no ❑no ❑no ❑no ❑no
Measured drop in water level O
accurate to 1/16 inch 0
Date of test 1126191 11 2614 - /
Test start time 0100 01 p0
Test end time 02 Ag 0200 M:00
ass ss pass ❑pass: ❑pass ❑pass
Results of test 3fail ❑fail 711ail ❑fall ❑fail ❑fail
inconclusive ❑inconclusive inconclusive Dinconclusive ❑inconclusive ❑inconclusive
Initials of tester PG PG PG
Repairs Needed Date of Repair Description of any Repairs
or
Replacement
Recbc�4113 wi1WcWS 1p falMa,IM1'e sae.
TM1e,efreetNaldllsptlW?msm NlsYto,im.iFaWM,O etlUe
ttll.
ADEM Farm 20 ml 72015