Loading...
HomeMy WebLinkAbout52710 ALR10BEVV 089 10-04-2019 INSPR NSPECT NAOctober 09, 2019 Jeff Enfinger, Vice President Blue Holes, LLC 8624 S. Memorial Parkway Huntsville AL Huntsville, AL 35802 RE:Facility Inspection -- Minor Deficiencies Noted The Forge NPDES Permit #ALR10BEVV Inspected 10/04/2019 Dear Jeff Enfinger, Vice President: Enclosed is a copy of an inspection report for the above referenced facility. A copy is also being provided to Water Division for their review. Please review the report and effectively address any items noted within ten (10) days of receipt of this letter. Please be advised that effective best management practices are required to be implemented and regularly maintained to minimize/prevent the discharge of sediment and other pollutants until disturbance activities are complete, the site is stabilized, and permanent re-vegetation is achieved. If you have questions regarding the inspection, please contact me by email or by phone (see below). Scott Gravette Field Operations Division (256) 432-2074 SGravette@adem.alabama.gov Enclosure: Inspection Report Sincerely, NPDES CSW (Construction Stormwater Inspection) : 10/04/2019The Forge : ALR10BEVV Inspection Detail 66736NMS Inspection #: Construction Stormwater,CSW (Construction Stormwater Inspection) Inspection Type: YesPart of EPA commitment? NoInspection was announced? Weather Conditions: Water Division Permit Detail ALR10BEVVWater Division Permit Number: 2019-05-09Permit Effective Date: 2021-03-31Permit Expiration Date: Blue Holes, LLCPermittee Organization: 8624 S. Memorial Parkway Huntsville AL Organization Mailing Address Line 1: Organization Mailing Address Line 2: HuntsvilleOrganization Mailing Address City: ALOrganization Mailing Address State: 35802 Organization Mailing Address Postal Code: Site Detail 61854.1Site ID + Version: The ForgeSite Name: PrivateFacility Ownership Type: Activity Description: Residential Subdivision Development Haysland Rd and S. Memorial Pkwy Physical Location Address Line 1: Physical Location Address Line 2: HuntsvillePhysical Location City: ALPhysical Location State: 35803 Physical Location Postal Code: MadisonPhysical Location County: Physical Location Description: Head South on Memorial Parkway. Turn right on Haysland Road. The site is located 0.6 miles west of the intersection of Haysland Road and Memorial Parkway in Huntsville, AL Construction of single family home subdivision FFG: 34.64 -86.57 34.646584Entrance Lattitude: -86.574786Entrance Longitude: Permit Contacts (1) Responsible OfficialAffiliation Type(s): JeffFirst Name: EnfingerLast Name: Blue Holes, LLCOrganization: Vice PresidentPosition Title: 2565331155Phone: 10/16/2019 9:17:34 AM 2 NPDES CSW (Construction Stormwater Inspection) : 10/04/2019The Forge : ALR10BEVV Permit Contacts (1) jeff@esd.netEmail Address: 8624 S. Memorial Parkway Huntsville AL Mailing Address Line 1: Mailing Address Line 2: HuntsvilleMailing Address City: ALMailing Address State: 35802 Mailing Address Postal Code: Site Contacts (0) Affiliation Type(s): First Name: Last Name: Position Title: Phone: Email: Inspection Summary 10/04/2019Inspection Begin Date: 10:38 AMInspection Begin Time: 10/04/2019Inspection End Date: 11:12 AMInspection End Time: Summary Comments: DecaturField Operations Division Office: Scott GravetteInspector: 2564322074Phone Number of Inspector: Signature of Inspector: 10/09/2019Signature Date: Shawn LaGroneReviewing Supervisor: 2564322076Phone Number of Reviewing Supervisor: Signature of Reviewing Supervisor: 10/16/2019Signature Date: 10/16/2019 9:17:34 AM 3 NPDES CSW (Construction Stormwater Inspection) : 10/04/2019The Forge : ALR10BEVV Records Review Checklist No, no one was available onsite for records review at the time of inspection. 1. Was an onsite records review conducted at the time of inspection? 2. Are the standard documents, records, and reports listed below maintained as required by the Permit and retained for at least 3 years? Yes No NA2.01. Complete Permit Application? Yes No NA2.02. Past (signed) Inspection Reports? Yes No NA2.03. (C)BMPP ((Construction) Best Management Practices Plan)? Yes No NA2.04. SPCC (Spill Prevention, Control, and Countermeasure) Plan? 3. Are the additional documents, records, and reports listed below maintained as required by the Permit? Yes No NA3.01. Rainfall Records? Permit Verification Checklist Yes No NA1. Was a valid Permit maintained at site and available for review? Yes No2. Was all active disturbance at the site covered under an active permit? Operations & Maintenance Checklist 1. Equipment Yes No1.01. Was a rain gauge observed onsite? 2. Processes/Practices Yes No2.01. Are BMPs properly implemented and maintained? Yes No2.02. Was the facility ID properly displayed? Yes No2.03. Were general housekeeping, solid wastes, fuels and/or chemicals, and gray/process water (e.g,. portable toilet, concrete truck washout) properly managed at the time of inspection? Yes No2.04. Were the facility exit(s) constructed and maintained to prevent offsite vehicle tracking? Yes No2.05. Was onsite sediment accumulation and/or onsite erosion, with potential water quality concerns, observed at the time of inspection? Yes No2.06. Was offsite sediment accumulation and/or offsite erosion, with potential water quality concerns, observed at the time of inspection? Receiving Water Checklist Yes No1. Was discharge occurring at the time of inspection? Yes No2. Were receiving waters evaluated at the time of inspection? Yes No NA3. Was sediment accumulation observed in State water(s) as a result of site activities? Yes No NA4. Was there a substantial visual turbidity contrast observed in the receiving water(s) as a result of facility discharge(s)? Yes No NA5. Were instream turbidity samples obtained at the time of inspection? (If yes, sample results are provided below.) 10/16/2019 9:17:34 AM 4 Additional Information The Forge : ALR10BEVV Permit Verification Checklist There did not appear to be any recent construction at the site. A large portion of the site appeared to be well vegetated and stable. However, large bare areas remain at the site. No significant erosion or sedimentation was noted at the site. 2. Was all active disturbance at the site covered under an active permit? Photo Taken:10/4/2019 10:50:08 AM A view of a portion of the site, showing bare areas. Photo Taken:10/4/2019 11:07:09 AM View of site showing well-vegetated stable portions of the site. Photo Taken:10/4/2019 11:09:37 AM View of the entrance to the site. 10/16/2019 9:17:34 AM 5 Operations & Maintenance Checklist 1.01. Was a rain gauge observed onsite? Photo Taken:10/4/2019 10:44:35 AM A rain gauge was employed at the site, however, the rain gauge contained water and had not apparently been checked for some time. Recommendation: BMPs have been implemented at the site. Silt fencing has been installed in some sections and well vegetated buffers exist at the site. There are, however, large bare areas where construction has not taken place for thirteen days or longer. Bare areas should have temporary seed, mulch, and/or other means of stabilization where construction has not taken place for thirteen days or longer. No significant erosion or sedimentation associated with the bare areas was noted. 2.01. Are BMPs properly implemented and maintained? Photo Taken:10/4/2019 10:50:08 AM View of site showing bare area where construction has not taken place for at least thirteen days. Photo Taken:10/4/2019 10:56:29 AM View showing some bare areas. 10/16/2019 9:17:34 AM 6 Operations & Maintenance Checklist Photo Taken:10/4/2019 11:01:07 AM View of silt fence at NW portion of the site. Photo Taken:10/4/2019 11:07:05 AM View of soil stockpile surrounded by stable well- vegetated buffer. The facility ID was properly displayed. 2.02. Was the facility ID properly displayed? Photo Taken:10/4/2019 10:44:24 AM 10/16/2019 9:17:34 AM 7