Loading...
HomeMy WebLinkAbout40571 007764 015 12-29-2022 MOWALK AEPACS MONTHLY WALKTHROUGH INSPECTION Digitally signed by: AEPACS 30 Day Walkthrough Inspection Checklist Date:2023.02. Subm0s on Data -06:00 Reason:Log Location:State of Alabama version 4.1 (Submission* HPR-60Z6-KN7YR,version 1) Details Submission Alias 30 Day Walk4wough Inspection Checklist Log(Form 558) Submission ID HPR-60Z6-KN7YR Form Input Report Entry Submission Method for Test Results Upload PDF of Test Results in Digital Format Is the Submission in response to an Waming Letter/Notice of Violation/Notice of Proposed Delivery Prohibition? Yes Site Information Permit Number(Facility ID Number) 25967-015-007764 Site Name BRYANT FEED&SEED Site Address 12334 HIGHWAY431 WELLINGTON,AL 36279 United States Upload Test Results Were all of the Spill basins and release detection equipment satisfactory at the time of the inspection? Yes Attach the PDF file of the test form Smut Gro MOWALK.odf-02/03/2023 01:53 PM Comment NONE PROVIDED 2/3120232:01:43 PM Page 1 of 1 MOWALK ADEM 30 DAY WALKTHROUGH INSPECTIOA CHECKLIST LOG FOR YEAR 99 5? Questions on how to complete this form should be directed to the Groundwater Branch,UST Connieflarce Section al 334 37P5655 Facili Name: Wa,.4 r ee Owner. ;;. ` n ✓r Address: f. 5 Address: .ice City,, CountyZip: "t,_, C" State,ZI : / Facility I.D.It. 9 S / "<r Phone#: ' s G Inspector Name: tuicqolInspector Phone 411 a- InspectorGorn n : 1 " InsWctions 1. Spill prevention equipment al UST systems receiving deliveries at intervals greedlifthan every 30 days may only be checked prior to each delivery. J� 2. Inspection must be performed in accordance with a nation �de1ally recognized practice(such as PEI RP-900,or equivalent), manufacturers instructions,or ADEM requirements. 3. Keep a record copy of this inspection for 1 year. Month of Inspection I Jan I Feb I Mar I A I May Jun I Jul I AugOct Nov I Dec Da of Inspection I t I I_ Spill Containment Eq pnant(Spill Bucket)Imapection Visually checked spill prevention equipment Yes eyes gry.. yes sMlys. Byes yes yes Byes des for dams e? ❑no O no O no ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no In y of bot Its of a do le d spill O yes ❑yes ❑yes ❑yes ❑ye A yes O yes ❑ e O yes O yes ❑yes O yes pven equipment ❑no ❑no ❑no ❑no O no ❑no ❑no ❑no ❑no ❑no ❑no O no iiverfi y king the ❑Na ❑Na ❑Na O n!a O rue O Na ❑Na ❑Na ❑Na ❑Na ❑Na ❑Na in for leaks? —/ —/ �/ Water fuel and/or D/ae yec yes Yas eyyas Ryes Ryes al. 0Tyas deeds found eq in enpill �❑no ❑no Ow ❑no O no ❑no ❑no ❑no ❑no ❑no ❑no ❑no prevention equipment? Water,fuel and/or "—/ — / / eyes W� debris removed from urges Mrye- Glees By�es aYyes Byes ye. Oyes Byes CIO. spill prevention ❑no ❑no ❑no ❑no ❑no ❑no ❑rat ❑no O no ❑no ❑no ❑no equipment and ❑Na ❑Na O rda O n/a O n/a O n/a O We ❑Na ❑Na ❑Na ❑Na ❑n/a disoosed of Check for obstructions Byes Julard, 0,0. 1 e-Y. I 12f. yes yes yes yes GFfee In the fill pipe? Orap ❑rat ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no Check fill cap to ensure ye � Eyes des l�es a yes gyps it fits securely on fill yes es es s es es pipe? ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no ❑no Ono ❑no ❑no Inspectors initials Release Detection Equipment Inspection ' Release detection operating with no O yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑yes ❑yea alarms dr un uarid, Ell ❑r no El no ❑no ❑no ❑ no ❑no ❑no ❑no ❑no ❑no ❑no o eratir loon itions? Reviewe lease detecti esting O yes ❑yes ❑yes ❑yes Oyes ❑yes ❑yea ❑yes O yes ❑yea ❑yes ❑yea records to Ourit they are Ono ❑no ❑no ❑rat Ono ❑no ❑no ❑no ❑no ❑no ❑no ❑no p n and ei . Inspectors initi Repairs Needed Date of Repair Description of any Repairs ADEM Form 558 03118